Motunau Beach - cnr Lindsay / Island Terrace - Fire Station Mon 17 Feb to Monday 17 March 2025
STARTS: 8am Monday 17 February
ENDS: By 17 March (if not sooner)
- The road will remain open but reduced to one-way traffic with Stop/Go lights. Please reduce speed as directed.
- Normal traffic flow will resume nightly after 6pm.
WHY: Our contractor is digging out the old storm water pipe and replacing it with a new, larger pipe and putting in new sumps.

Rotherham Road South between Leaches Rd & South Street - full road closure - Mon 17 Feb to Friday 21 March 2025
STARTS: Mon 17 February
ENDS: Fri 21 March
Please note special arrangement for Friday 28 February 2025 at bottom.
Hours: 7am - 7pm (approx)
- Rotherham Rd South between Leaches Rd and South St will be closed for approximately 5 weeks, with detours in place.
- The road will open overnight and on weekends, with some light works continuing on weekends.
Detour routes
As there are no fully sealed roads nearby for detouring traffic around the work site, and to avoid congestion, we have utilised north and south-bound detours to avoid tight road widths and for safe traffic movement.
Northbound Traffic: Right onto Leaches Road, left onto Constitution Road, left onto Mt Palm Road, and continue on Heaton Street.
Southbound Traffic: Left onto Heaton Street, continue on MT Palm Road, right onto Constitution Road, left onto Isolated Hill Road, right onto St Leonards Road, exiting onto SH7 Culverden.
Please follow all detour signage and temporary speed limits.
WHY: Road rehabilitation project and drainage improvements.
For inquiries, please contact the Corde Operations Manager on 03 311 8080 (ref: Rotherham South closure).
Please note - A&P Show - Rotherham Rd South Friday 28 February 2025:
Traffic flow relating to the roadworks on Rotherham Rd South will be temporarily amended to allow for northbound traffic to access the Amuri A&P Showgrounds on Friday afternoon.
Friday 28 February: The road will be open for northbound traffic from early afternoon to provide access for stallholders, staff and Show entrants.
Detour for southbound traffic remains in place.
The road re-opens overnight and on weekends.Any queries to Corde Operations Manager on 03 311 8080 (ref: Rotherham South closure).


Mt Cass Road closed for Logging/Harvesting operation - The road closure restricts access to the end of the road. This closure has been extended and is due to complete by 31 March 2025.
Due to safety Mt Cass Road, Waipara is required to be closed during a logging operation. Trees are being logged within two tree lengths of a public road.
Vehicles are able to arrange access via Laurie Forestry - 03 359 5000
Reserve Road, Broomfield - full road closure. Mon 17 Feb to 28 March 2025
As part of MainPower's new substation build on Reserve Road, new power poles will be installed along Reserve Road. There will be open trenching for cables. To reduce future impacts to traffic, Hurunui District Council will concurrently upgrade the water network in this portion of Reserve Road and Lawcocks Road intersection. These water upgrades are to replace aging infrastructure and add capacity for future growth in the areas surrounding Amberley.
As part of this work, MainPower crews will be trenching across the road so a full closure is required.
This is Stage One of the sub-station upgrade. Once complete, Reserve Road will re-open and Stage Two will begin.
Stage Two will impact Lawcocks Road. It is planned that single lane, one direction traffic flow will be implemented - northbound traffic will be detoured. More information on dates etc. will be known once Stage One is completed.
Stage One - full closure of Reserve Road.
Stage Two - Lawcocks Road open only to southbound traffic. Northbound traffic will be detoured.
- Closure location: Reserve Road Amberley (Between Lawcocks Rd and Douglas Rd)
- Closure time: 07:00-18:00 daily
- Reason for closure: Upgrading existing overhead line.
For information on the project please contact Mainpower - 0800 30 90 80
Stonyhurst Road closed Tuesday 18 Feb to Friday 14 March 2025
Detours in place via Blythe Road, and Hurunui Mouth Rd - section of Stonyhurst Road and Motunau Beach Road.
Roads may be closed for short periods. These are captured on the road Information Map where possible.
Historical:
FORDS
- Fowlers Lane ford - CLOSED
ROADS
- Manuka Bay Road - CLOSED - The second half of Manuka Bay Road, (beach end) is closed, from the gate.